INTRODUCTION
Supplying, Erecting and Implementing mechanical, electrical and transmission pipe lines,
operation and implementation of all civil works as well as maintenance of Al-Karbala water Treatment project
capacity (4000m³/h) under the general conditions for the work of civil engineering and general conditions of
the work of mechanical and chemical in the province of Holly Karbala.
DESCRIPTIONS
It Is one of the big-projects contracted by Al Mustakble Al Sa’eed Group of companies (MSG) on the date
26 \04\ 2010 with the Ministry of Municipalities and Public Works (MMPW), Supplying, Erecting and
Implementing mechanical, electrical and transmission pipe lines, operation and implementation of all
civil works as well as maintenance of Al Hindiya water Treatment project capacity (4000 m³/ h) under the
general conditions for the work of civil engineering and transmission pipe lines(67,5 km) and a total cost of
61,612) Billion Iraqi dinar, and the duration of eighteen months.
The Management of the Al Mustakble Al Sa’eed Group of companies (MSG) contract with the largest
world’s leading companies in the processing of electrical and mechanical equipment as well as a structural
design to enhance and insure the quality of the completion of this project, including the cooperation with
companies from , French, Italian, German, Japanese and others qualified companies.
Where was the dispatch of more than 35 engineers to these international companies to benefit from their
expertise as well as establishing job opportunities for people from the area, we employed more than 400
manpower (engineers, technicians and specialist contractors), in addition to that we must used some of the
engineering consultancy coming from outside the country in order to improve quality and improve
performanceto the highest international standards.
The work in progress and the performance of high achievement and curve upward is growing with support
of the teamwork sprit and the efforts with valuable experience.